
Cumayasa Subdivision
Infrastructure for a 400-lot subdivision: streets, drainage and networks.
LocationCumayasa, La Romana
Area130,000 m²
Units400 lots
RoleInfrastructure
Home › Earthworks and paving
Service
We prepare the land and hand over the finished road: clearing, cut and fill, compaction, prime coat and asphalt concrete. For land subdivisions, residential developments, hotels and roads.

Clearing, cut and fill, shaping and compacting the base so it is ready for the prime coat and asphalt.
Yes. The Cumayasa subdivision in La Romana covers 130,000 m² with 400 lots. We also did the earthworks and RC2 prime coat for the Palmares de Caleta residential development.

Infrastructure for a 400-lot subdivision: streets, drainage and networks.
LocationCumayasa, La Romana
Area130,000 m²
Units400 lots
RoleInfrastructure

Finished internal road of the subdivision, seen from the air.
LocationLa Romana
ScopeInternal roads

Access road, roundabout and ramps for the hotel complex, with drainage and signage.
LocationPunta Cana
Year2014
ScopeAccess road, roundabout, ramps