Track record

2011 — 2026.

Partial list of projects delivered and supervised. Those marked in green are flagship works. The full record is available on request.

2011Cost engineer — La Romana MunicipalityLa Romana
2012Cost engineer — Punta Cana Tourist Boulevard, Grupo Montero BáezLa Altagracia
2014Access road, roundabout and ramps — IberostarPunta Cana
2014Road supervision, acceleration and deceleration lanes — Hard RockPunta Cana
2016Main entrance road and storm drainage — Hotel LTILa Altagracia
2016La Lechuza RD Stables — exposed timber structure, 1,400 m²Benerito
2018Dye Fore Pro Shop rebuild — Casa de CampoLa Romana
2018Gym and dining hall, Kansas City Royals Academy — Hugo Pol ConstruccionesGuerra
2019Floor and guest-room rebuild — Casa de Campo / BestinProLa Romana
2021Artificial beach constructionCap Cana
2022Earthworks and RC2 priming — Residencial Palmares de CaletaLa Romana
2023Samanes 52 and Sombrero 42 — pool, outdoor bathrooms and walkwaysLa Estancia
2023–25Green Valley Town Houses — 9 unitsBayahíbe
2024Streets, storm and sanitary systems — Residencial SaviñónRomana del Oeste
2024One-million-gallon pool — El SombreroLa Estancia
2024Streets and storm system — Catalina SunsetCaleta, La Romana
2025–26Genesis Grisel — 6 floors, 16 unitsSanto Domingo Este
2025–26Camp and building for Acunmedya TVLa Romana
2026Plaza Nueva office and Meeting Room refit — Diamond MBLa Estancia
WhatsApp